The Journal · November 11, 2026 · 7 min read · By Émilie, Head of Content
An apartment to renovate is paid for twice: at the notary, then on site. Here is how to price the second part before you sign the first, with what we look at when a future buyer shows us a property.
In short
For an apartment that needs renovating, the real price is the sum of two amounts: what you pay the seller and what the works cost. Making an offer without knowing the second is negotiating blind. An estimate, even an indicative one, changes the conversation: it tells you whether the asking price leaves room for the works you want, and it lets you argue for a lower offer with figures rather than an impression.
The calendar pushes you to move fast: in Paris, a well-located property can go within days. Hence the value of reading an apartment from the first viewing, then having the estimate confirmed by a contractor before you commit.
A purchase viewing is not a site survey, but a few points are enough to gauge the scale of the works:
Before the preliminary contract, the seller provides a file of technical surveys and the co-ownership documents. Three readings matter for the works:
If you plan to let the apartment, the DPE matters too: since 1 January 2025, a G-rated home can no longer be let under a new lease, and the timetable set by the Climate and Resilience Act extends the rule to F, then E ratings. Energy-performance works then belong in the budget.
The habit that avoids nasty surprises: ask the seller for the amount of works already voted and the date of the next call for funds. For a large apartment, an upcoming façade renovation can weigh heavily.
Viewing an apartment to renovate? Tell us about it in a few lines: we come back to you within 48 hours with a first reading of scope, order of magnitude and a realistic timeline.
Our prices are per square metre, excluding custom millwork (+€500 to €700/m² for a complete project, €600/m² on average) and design. Here is what our 2026 grid gives for three sizes; these are worked examples, not the budget of an actual project.
| Level | Price per m² | 80 m² | 120 m² | 180 m² |
|---|---|---|---|---|
| Refresh | €1,000 to €1,200 | €80,000 to €96,000 | €120,000 to €144,000 | €180,000 to €216,000 |
| Complete renovation | €1,800 to €2,200 | €144,000 to €176,000 | €216,000 to €264,000 | €324,000 to €396,000 |
| High end | €2,400 to €2,800 | €192,000 to €224,000 | €288,000 to €336,000 | €432,000 to €504,000 |
| Exceptional | over €3,000 | from €240,000 | from €360,000 | from €540,000 |
The item-by-item breakdown is in our article on the cost of a Haussmann renovation. If you are buying in the 16th, our page on apartment renovation in Paris 16th covers its specifics.
A grid gives an order of magnitude; only a professional who has seen the property can say where yours sits. Two ways to work with us:
If you go ahead with the property, we then produce a detailed estimate, item by item. That is the document you use to make choices, and to negotiate.
The period between the preliminary contract and completion, often around three months, is the best time to prepare the works. Most of our clients sign the design phase during that period so that works start the day they get the keys: drawings, choice of materials, co-ownership authorisation if needed, ordering custom pieces, which take eight to sixteen weeks to make. The works then take four to eight months depending on size.
To go further: how long an apartment renovation takes, permits for renovating in Paris and, on the seller's side, the works that add value before a sale. Our projects show what these apartments become, and our page on apartment renovation in Paris describes how we work.
By combining a price-per-m² grid, which gives the order of magnitude, with the view of a contractor who has seen the property, to place yours within the range. At W.A.R.D: €1,800 to €2,200/m² for a complete renovation and €2,400 to €2,800/m² for the high end, excluding custom millwork and design.
Yes, and a written estimate is the best argument: it replaces an impression with figures. It does not guarantee the seller will agree, but it stops you overpaying for a property whose works were underestimated.
The lead survey (buildings constructed before 1949), the electrical and gas installation reports when they are over fifteen years old, the asbestos survey (building permit before 1 July 1997) and the energy performance certificate (DPE), plus the minutes of recent general meetings for co-ownership works voted or planned.
Ideally before the offer, for a first reading of the property, then during the period between the preliminary contract and completion for design and a detailed estimate. Works can then start the day you get the keys.