The Journal

Insights & expertise.

Pricing, methods, pitfalls to avoid: what ten years of high-end projects have taught us — shared candidly.

November 17, 2026 · Guide

Kitchen countertops: marble, quartzite or sintered stone?

Marble, quartzite, granite, quartz, sintered stone: resistance, upkeep, pitfalls and installation, to choose by how you cook.

→
November 17, 2026 · Guide

Bespoke joinery: an apartment designed for you

Libraries, dressing rooms, kitchens: materials, steps, manufacturing lead times and budget per square metre.

→
November 17, 2026 · Guide

Energy renovation of a Haussmann apartment: insulate without losing what matters

Windows, exposed walls, ventilation and energy rating: improve performance without sacrificing mouldings or parquet.

→
November 17, 2026 · Guide

Preliminary contract signed: prepare your renovation before the keys

What can be ready before completion, what is best left until later, and a typical timeline to the keys.

→
November 11, 2026 · Guide

Buying an apartment to renovate: estimate the works before the offer

What to check at the viewing and in the documents, the budget per square metre and the right moment to have the works priced.

→
November 17, 2026 · Guide

Luxury renovation materials: how to choose them

Marble, herringbone oak, brass, natural stone: choosing by use, upkeep and budget.

→
November 2, 2026 · Figures

Renovating in Paris: what our projects show

Real surfaces, timelines and team sizes from our last nine completed projects: apartments, offices and stores.

→
November 2, 2026 · Guide

Renovating a Paris apartment from abroad

One contractor, remote site follow-up, budget and timeline: how to run your renovation without living in Paris.

→
October 29, 2026 · Case study

Newcop: from signed lease to opening day in three months

110 m², 9 trades, design and build under one contract: how a former leather-goods shop became a sneaker store.

→
October 1, 2026 · Guide

Which works really add value before you sell?

What pays back, what rarely does, the DPE, co-ownership rules — and why pricing the works can beat doing them.

→
September 1, 2026 · Case study

Le Marquis de Versailles: 130 m² across two levels

6 months on site, 12 trades for 130 m²: why a duplex mobilises more people than an apartment twice its size.

→
August 21, 2026

Which permits does a renovation in Paris need?

Prior declaration or planning permit, heritage architect, co-ownership consent, change of use: the formalities to plan for and their real timelines.

→
August 9, 2026

Renovating offices in Paris: the design & build guide

The six stages of an office project, working back from a lease deadline, budgets per m², occupied-site works and public-access compliance.

→
July 27, 2026 · Case study

Le Vénitien: 240 m² designed as a family cocoon

7 months on site, 9 coordinated trades: how an intention — “somewhere we feel good” — becomes a works programme, phase by phase.

→
July 11, 2026

How long does renovating an apartment in Paris take?

From design to handover: the real timeline of a renovation, phase by phase, by surface — and our actual on-site completion times.

→
July 4, 2026 · Case study

Le Trocadéro: from law firm to a 227 m² apartment

10 months, 16 trades, a complete change of use: inside our most ambitious project, from office floor to luxury residence.

→
July 2, 2026

How much does renovating a Haussmann apartment in Paris cost?

Real price ranges per m², the line items that drive the budget, what makes Haussmann buildings special, and how to protect your budget.

→
July 2, 2026

General contractor or architect + trades: which setup to choose?

Single point of contact or separate coordination? Both models compared — responsibilities, budget, timelines — so you can decide with clarity.

→
July 2, 2026

Renovating to rent: the high-end furnished market in Paris

What level of finish to aim for, what budget to plan, which mistakes to avoid — the trade-off that maximises rent per euro invested.

→

A question about your project?

Get an estimate

Reply within 48 h · Paris & Miami

Just a question? Write to us — answer within 48 h, no commitment.

WriteGet an estimate