Between the preliminary contract (compromis de vente) and completion, around three months often pass in France. Used well, they let works start on the day you get the keys. Here is what can be ready, what is best left until later, and in what order.
In short
Once the preliminary contract is signed, you are not yet the owner: there is the ten-day cooling-off period, the conditions precedent, the mortgage, then completion, often around three months later. Nothing stops you moving forward, though. Most of our clients sign the design phase during that period, so that works start on the day they get the keys instead of starting, that day, to look for a contractor.
These pointers do not replace your notary's advice; the notary tailors the preliminary contract to your project.
Starting works before completion is possible with the seller's written consent, but rarely wise. Until the sale is signed it can still fall through: loan refused, condition precedent not met, pre-emption right exercised. The money spent would be lost, and you would have improved someone else's property. Before completion, you are not insured as the owner either.
The right split is simple: design and authorisations during the preliminary-contract period, works from the keys.
The preliminary contract can protect your project. If your works depend on co-ownership approval, for example to open a load-bearing wall, ask your notary whether the sale can be made conditional on that approval. Without it, you could buy a property whose project is then refused.
Preliminary contract signed or in sight? Tell us about the property in a few lines: we come back to you within 48 hours with a first reading of scope, order of magnitude and a realistic timeline.
An indicative timeline, to adjust to the completion date and the scope of the project. Design generally takes two to three months: the length of a preliminary-contract period.
| Moment | What gets prepared |
|---|---|
| Preliminary contract signed | The ten-day cooling-off period runs. The technical visit is arranged with the seller. |
| First weeks | Technical visit and measured survey; brief: what you want to change, keep, restore. |
| Mid-period | Design: drawings, choice of materials, detailed item-by-item estimate. Authorisation requests if needed. |
| Before completion | Choices approved, schedule set, long-lead orders ready to go as soon as the sale is certain. |
| Keys handed over | Works start, for four to eight months depending on size. |
Between the preliminary contract and completion, the co-ownership carries on: a general meeting may vote works. The preliminary contract often sets out how such decisions are handled and who pays, notably if the seller forwards the notice of meeting to you. Ask to be kept informed of upcoming meetings. The points to check before you even make an offer are covered in our guide to buying an apartment to renovate.
A free, no-commitment advisory visit on site, before the offer or once the preliminary contract is signed; then the design, the detailed item-by-item estimate and the preparation of authorisations. When the keys are handed over, works start with one contact, one price and one date: the principle of the general contractor.
To go further: how long an apartment renovation takes, permits for renovating in Paris, our page on apartment renovation in Paris and our projects.
It is possible with the seller's written consent, but not advisable: until completion you are not the owner, and if the sale falls through (loan refused, condition precedent, pre-emption), the money spent is lost. It is better to complete the whole design during the preliminary-contract period and start works on the day you get the keys.
You cannot vote yet, but the seller, still a co-owner, can ask the building manager to put your project on the agenda of the next general meeting. Your notary can also make the sale conditional on that approval in the preliminary contract.
Yes, especially if your mortgage also finances the works: banks generally ask for quotes. A detailed, item-by-item estimate also sets the schedule so works can start the day you get the keys.
On the day you get the keys, if the design, choices and authorisations were prepared during the preliminary-contract period. The works then take four to eight months depending on size.