The Journal · November 17, 2026 · 7 min read · By Émilie, Head of Content
A Haussmann apartment can gain markedly in comfort and performance without sacrificing its mouldings, parquet or period windows. It all comes down to the order of priorities and the choice of walls. Here is how we approach it.
In short
A Haussmann apartment is not inherently draughty. Its street façades are often thick, its volumes generous, and it is surrounded by other heated homes. Losses concentrate on a few points: windows, especially single-glazed ones, walls facing outside or onto a courtyard, floors and ceilings when the apartment is on the top floor or above a cold space, and air leaks around the joinery.
That is good news: these precise points can be addressed without transforming the apartment. A recent energy performance certificate (DPE) or an energy audit shows where heat is really lost; it is the starting point of any serious estimate.
In a Haussmann apartment, windows often weigh most on discomfort: cold surfaces, draughts, street noise. Three options, from lightest to most complete:
A window is visible from outside. Co-ownership rules usually require uniformity; a general-meeting authorisation may be needed, as well as a prior declaration at the town hall and, in protected areas, the opinion of the Architecte des Bâtiments de France. Our guide to permits for renovating in Paris details these steps.
On a Haussmann building, external insulation of the façade is rarely an option: it is a common part, often protected, and would require a co-ownership vote. Insulation is therefore done from inside, and every centimetre counts.
The right moment is a complete renovation. When the wiring is being redone and the walls are already open, insulating exposed walls and reworking the joinery costs far less than doing it alone, later, in a finished apartment.
A Haussmann apartment to make more comfortable? Tell us about it in a few lines: we come back to you within 48 hours with a first reading of scope, order of magnitude and a realistic timeline.
An apartment made more airtight must be better ventilated, or moisture settles in: condensation on glazing, mould in bathrooms. Ventilation is designed together with insulation, with discreet extract vents in wet rooms and air inlets in the joinery.
For heating, everything depends on the building. With shared heating, the main levers are controls and balancing the radiators, some of which, in cast iron, deserve to be kept. With individual heating, the choice of system weighs directly on the energy rating.
If you plan to let the apartment, the DPE has become decisive: since 1 January 2025, a G-rated home can no longer be let under a new lease, and the Climate and Resilience Act extends the rule to F, then E ratings. For a main residence, it weighs mostly on resale value, as explained in our article on the works that add value before a sale.
Support exists, such as MaPrimeRénov' or the zero-rate eco-loan, but conditions change often: check them on the France Rénov' website at the time of your project, before signing quotes.
At W.A.R.D, energy performance is not a separate project: it is built into the renovation, trade by trade. Joinery, plastering and mouldings, electrics, plumbing, ventilation and heating are coordinated by a single lead on a single schedule, so no finished wall is reopened to run a duct. The budget sits within our renovation ranges per square metre, and the timeline within that of a complete renovation.
To go further: our page on apartment renovation in Paris, the one on the sixteen trades we coordinate, and our projects.
Yes, by choosing the walls: priority goes to exposed walls with little decoration, while walls with mouldings are left intact, or cornices are restored in plaster after insulation. On a decorated wall, thin solutions limit the loss of floor area and detail.
Often, yes. Windows change the building's external appearance: co-ownership rules usually require uniformity, a general-meeting authorisation may be needed, as well as a prior declaration at the town hall, and the opinion of the Architecte des Bâtiments de France in protected areas.
Usually with single-glazed windows and walls facing outside, then ventilation and the heating system. The right order depends on the home's diagnosis: an audit or a recent energy performance certificate (DPE) shows where heat is lost.
Support exists in France, such as MaPrimeRénov' or the zero-rate eco-loan, but conditions change often. Check them at the time of your project on the France Rénov' website, before signing quotes.
"Many thanks to Anthony and his team for their professionalism, their advice and the quality of the work. The result is refined and exactly what I expected." (translated)Adrien A. · Google review
Read the reviews →Just a question? Write to us — answer within 48 h, no commitment.