Residential renovation · Paris
Marble, walk-in shower, exceptional brassware: we design and deliver your bathroom as a signature room — waterproofing, plumbing and ventilation included, under a single contract.
Why W.A.R.D
Waterproofing, plumbing, electrics in regulated safety zones, ventilation: the bathroom concentrates more trades per square metre than any other room. A general contractor coordinates them under a single responsibility.
Our own ten-year warranty insurance covers every project — waterproofing and networks included. In the wet room, where the slightest defect is paid for years later, that cover is no small detail.
Marble laid to the rules of the art, recessed brassware, vanity units drawn to measure: the level of finish that won over Dior, Étam and the most demanding owners.
Projects
No other room concentrates so much technique in so few square metres. Behind the marble and the brassware, a successful bathroom is first and foremost flawless waterproofing, drainage laid to the right fall, properly sized ventilation and electrics that comply with the regulated safety zones around water. That is precisely why we approach it as a general contractor: plumber, electrician, tiler, plasterer, joiner and painter intervene in a precise order, under one contract and one responsibility — ours. Our bathrooms are most often born at the heart of a complete apartment renovation, as at Trocadéro (227 m² of Haussmann fabric, sixteen trades) or at Le Vénitien (240 m² rethought as a family cocoon); but the method remains the same when the bathroom is a project in its own right. The same logic applies to the home's other technical room: a kitchen renovation obeys the same rules of coordination.
It is the invisible item that makes the difference between a bathroom that lasts for decades and a water-damage claim from the neighbour below. Liquid-applied waterproofing or an under-tile membrane, upstands around the perimeter, careful treatment of the singular points — drain, threshold, corners: in Paris's period building stock, where timber floors move with the seasons, this workmanship tolerates no approximation. Our teams execute it to the rules of the art, and our €5,000,000 ten-year warranty insurance covers it for ten years.
Renovating a bathroom without renewing tired networks is laying marble on the provisional. We use the strip-out to bring the supplies and drainage up to standard: removal of any remaining old lead pipework, resized waste runs, accessible isolation valves, manifolds neatly recessed. Moving a bathtub, or creating a shower where there was none, means checking the drainage falls and, at times, working with the building's shared soil stacks — a point we validate at the design stage.
It is the most frequent request — and the one that demands the most rigour. A true level-entry shower requires a recess in the floor or an ultra-low-profile tray, a perfectly set fall, a properly sized channel or drain, and total waterproofing of both floor and walls. In period buildings, where the available depth is counted in millimetres, we study each case: partial recessing, a discreet raised platform, a tile layout designed to guide the water. The result must be as flawless in use as it is to the eye.
A bathroom without air renewal degrades fast: persistent condensation, blistering paintwork, blackening joints. We systematically build ventilation into the project — mechanical extract ventilation, a timed or humidity-controlled extractor depending on the apartment's configuration and what the building allows — and we conceal it: ducting in the suspended ceiling, discreet grilles, silent operation. It is one of the sixteen trades we coordinate in-house.
The high end is decided in the materials and in how they are laid. Marble in full-height book-matched slabs, natural stone, terrazzo, zellige or stone-effect porcelain: each material carries its own constraints of weight, layout and treatment — a poorly sealed marble stains, a poorly laid zellige ripples. Our artisans work these materials with the gestures they demand: fine joints aligned from the doorway, vanity tops shaped from a single piece, masonry niches built to the dimensions of the objects they will hold. The brassware — recessed, thermostatic, in brushed brass or bronze finish — is chosen early in the design, because its concealed bodies determine the position of the partitions. And custom millwork does the rest: a double vanity unit drawn to the millimetre, full-height mirror work, invisible storage. It is this level of exacting standards that runs through every project in our portfolio, from Trocadéro to Le St Georges, 145 m² of Haussmann fabric under way in the 9th.
One contract, one responsibility. Design, plumbing, waterproofing, tiling, electrics, ventilation, finishes: as a general contractor, we carry the whole — committed price, committed schedule, €5,000,000 ten-year warranty insurance. You coordinate no artisans: you have one point of contact, and a key-handover date.
A bathroom renovated seriously is not delivered in a week — and beware of anyone who promises it. Allow 3 to 6 weeks of works depending on scale: the complete strip-out first, then the reworking of the plumbing and electrical networks, the partitions and linings, the waterproofing — with its incompressible drying times —, the laying of the finishes, the installation of the sanitaryware and brassware, and finally the finishing touches and the silicone. Each stage conditions the next: tiling laid over waterproofing that has not dried is tiling to be redone. Upstream, the design phase fixes the plans, the tile layout and the choice of materials, so that nothing is improvised once the site opens. And because the works deprive the home of an essential room, we organise the site to reduce the disruption: protected circulation routes, a tight programme, daily coordination of the artisans.
A bathroom budget depends on three variables: the condition of the existing networks, the level of the materials, and the complexity of the changes (moving a shower costs more than replacing one). At the scale of an apartment, observed ranges in Paris run from €1,000–1,200/m² for a refresh, €1,800–2,500/m² for a carefully executed complete renovation, and €2,500+/m² and beyond for the high end — the bathroom sitting, per square metre, at the top of these ranges given how much technique it concentrates. Our price guide details these orders of magnitude item by item. For a precise costing of your project, describe it to us: answer within 48 hours.
FAQ
It depends on the condition of the networks, the materials and the floor area. At the scale of an apartment, ranges run from €1,000–1,200/m² for a refresh to €2,500+/m² for the high end — the bathroom being one of the most technical rooms per square metre. Only an item-by-item costing is authoritative: request yours, answered within 48 h.
For a complete renovation carried out seriously — strip-out, networks, waterproofing with its drying times, tiling, brassware, finishes — allow 3 to 6 weeks depending on scale. Our schedules are contractually committed.
Our own ten-year warranty insurance covers every project up to €5,000,000 — waterproofing and networks included, the most sensitive items in any bathroom — in addition to the statutory guarantees of perfect completion and proper functioning.
Most of the time, yes — provided the recess in the floor, the drainage fall and the under-tile waterproofing are studied. Where timber floors rule out full recessing, an ultra-low-profile tray and an adapted tile layout preserve the level-entry effect.